Client-side cost and commercial management on a major waste-management and infrastructure programme delivered for seven north London boroughs.

Photo: "London Waste Ecopark" by Ibn Musa, CC BY-SA 2.0, via Wikimedia Commons (cropped).
NNODI Group’s Managing Director provided cost and commercial management services to the North London Waste Authority through a long-term secondment from Rider Levett Bucknall. The commission formed part of the North London Heat and Power Project, a major waste-management and infrastructure programme delivered on behalf of seven north London boroughs.
The programme is intended to provide modern facilities for the collection, management, treatment and disposal of waste generated by more than two million London residents, while supporting safer and more environmentally responsible waste management.
The programme involved the coordinated delivery of multiple enabling, demolition, utility and civil-engineering work packages within a complex operational environment, all of which had to integrate with the wider programme while maintaining access, operational continuity and coordination between contractors, consultants, operators and statutory stakeholders. Key commercial challenges included:
Acting as Commercial Manager and Quantity Surveyor, NNODI Group’s Managing Director provided client-side cost and commercial management across several critical workstreams, covering the full commercial lifecycle from early cost planning and procurement through to contract administration, change control, forecasting and account management. Responsibilities included:
Detailed cost estimates and pre-tender estimates were developed to establish appropriate budgets before contractual commitments were made, taking account of scope maturity, design development, construction methodology, site constraints, programme requirements, market conditions, utility and operational interfaces and risk allowances.
Commercial support covered tender documentation, pricing structures and procurement strategies across multiple work packages, using framework procurement and competitive tendering. Submissions were reviewed for price, scope compliance, qualifications, exclusions, programme implications, risk allocation and value for money, supporting transparent and defensible contractor-selection decisions.
A structured change-control approach was applied to compensation events, instructions, scope development and unforeseen conditions, with each potential change reviewed for contractual entitlement, causation, cost impact, programme implications and effect on forecast final cost. Regular cost reports gave the client visibility of approved budgets, awarded contracts, committed expenditure, pending procurement, assessed changes, commercial risks, contingency requirements and forecast outturn costs, alongside value-engineering reviews and commercial risk assessment throughout procurement and delivery.
The secondment concluded in January 2026 after more than three and a half years of commercial support. The experience demonstrates the ability of NNODI Group’s leadership to operate within major, multidisciplinary infrastructure programmes and provide effective client-side commercial management from procurement through delivery.
Tell us about your project and we’ll explain how we can help, with scope and fee agreed before anything starts.
Discuss your project →